Design · Permitting · Construction · Closure · Compliance
CENTEC brings decades of experience in solid waste facility design, permitting, construction and compliance, from the first permit application through closure, post-closure and financial assurance.
What we do
Everything a solid waste facility needs across its life, from siting and permitting through construction quality assurance, closure, gas management and the financial assurance the agency wants to see.
From complete Part 1 (A) and Part 2 (B) permit applications, to major permit modifications for facility expansion, to everyday minor modifications, clients are guided through each step of the permitting process.
Closing portions of a landfill while the site is still active can be very beneficial to operations. Caps decrease leachate production and can eliminate leachate seeps on sideslopes that would otherwise contaminate surface water.
CENTEC personnel have designed, permitted and managed the construction of landfill gas projects for both large and small facilities.
Services extend past the permit itself to emissions monitoring, calculation and reporting, odor evaluation and control, and the design, permitting, construction and maintenance of both active and passive landfill gas collection systems.
Permit and plan certification is provided through Professional Engineers licensed in West Virginia, Maryland, Virginia, North Carolina and Tennessee.
CENTEC is intimately familiar with existing state solid waste management regulations, and works with state regulators to monitor proposed legislation. That experience is used to represent clients in all matters concerning facility operations and permitting.
The work covers both the estimate and the funding behind it, including the closure plans and timelines the estimate is built on.
Contractors have to be able to understand what is to be built from clear, concise design plans, technical specifications and bidding and contract documents.
Construction Quality Assurance and certification are what prove the intent of the facility’s design and permit, and the regulations, were adhered to. CENTEC can provide complete contract administration or assistance only, depending on what the client needs.
Project types
The work below covers the range CENTEC is normally engaged for. If your project is not on the list, it is still worth a call – most of it is a variation on the same sequence.
Ask about your site
Send the facility, the county and where you are in the permit cycle. We will tell you what the site actually needs and what it takes to get there.